For homeowners · Start a project
Describe it in your own words.
We turn it into a job contractors can bid on
You do not need to know the trade terms. Write what you want the way you would say it, and we turn it into a clear write-up, the steps involved, and a private budget only you see.
Free to post · Your budget stays private · Pay by milestone
A few sentences in, a clear job out
Contractors price what they can read. We turn your note into the write-up they need, so every bid starts from the same page.
What you type
Full cosmetic remodel of our 5x7 bathroom. Keep the layout and the tub. New prefab tub and shower surround, new vanity with a quartz top, new faucet, LVP floor, new trim, and paint the walls and ceiling. Mid to upper grade finishes. Want to start next month.
What contractors see
Full cosmetic remodel of a 5x7 bathroom. Keep the current layout and bathtub, with mid to upper grade finishes. Start next month.
Work requested
- 1 Remove existing fixtures and finishes, including the tub and shower surround, vanity, faucet, flooring, trim, and paint
- 2 Install a new prefab tub and shower surround
- 3 Install a new vanity with a quartz countertop and a new faucet
- 4 Lay new luxury vinyl plank flooring
- 5 Install new trim around the room
- 6 Paint the walls and ceiling in your choice of color
- 7 Clean up the site after the work is done
Plus the details for bidding: room size, finish level, and that it is an occupied home.
Know the steps before anyone shows up
See the work in the order it happens, and the building codes that apply to it. When a contractor walks you through their plan, you already know the shape of it.
Code notes
IRC R307.2
Water-resistant finishes are required around the tub and shower.
IRC R702.3.8
Rules for the drywall finish behind and around the new work.
IPC 405.3.1
Minimum clearance around fixtures so the room stays usable.
- 1
Demolition and removal
Take out the old surround, vanity, faucet, flooring, trim, and paint.
- 2
Tub and shower surround
Install the new prefab surround in the existing layout.
- 3
Vanity and faucet
Set the new vanity with its quartz top and hook up the faucet.
- 4
Flooring
Lay luxury vinyl plank across the whole bathroom.
- 5
Trim and paint
New trim, then walls and ceiling in your color.
- 6
Final cleanup
Leave the room clean and ready to use.
Plus the materials list, with quantities.
Go in knowing where the money goes
See the job broken into materials, labor, permits, and contingency before any bids come in. Contractors never see it, so it cannot anchor their price.
Every bid prices the same job
Contractors bid on the same write-up, so you compare like with like instead of three different guesses. When you pick one, you pay milestone by milestone, and each payout is held until you approve the work.
How held payments protect your moneyStart with a clear job, not a guess
Free to post. Your budget stays private.